AIR CANADA CENTRE - Phase 1

Air Canada Centre - Phase 1A Perimeter Eductor System was used to dewater the excavation for the Air Canada Centre. Built at the foot of Toronto's lakeshore, Atlas' Eductor System pumped over 200 Million US Gallons (757,000 m³) of groundwater during the excavation for the stadium. The installation of the system and lowering of the water table were completed ahead of schedule and within budget.